Following possessions and staging works over Christmas and New Year at London Bridge Station, Borough Viaduct and Borough High Street Bridge are now open to rail traffic.

The design was undertaken by Atkins on behalf of Network Rail and construction was by Skanska with the steelwork fabricated and erected by Watson Steel with Mammoet as heavy lift specialists.

This YouTube video shows the launch of the bridge from the approach span of Borough Viaduct, above Borough Market:
See also “Experience in the Rail Sector” on the V-Consult Limited website