Borough Viaduct Open

Following possessions and staging works over Christmas and New Year at London Bridge Station, Borough Viaduct and Borough High Street Bridge are now open to rail traffic.

Borough Viaduct Open

Borough High Street Bridge

The design was undertaken by Atkins on behalf of Network Rail and construction was by Skanska with the steelwork fabricated and erected by Watson Steel with Mammoet as heavy lift specialists.

Borough Viaduct open for Charing Cross Services

Borough High Street

This YouTube video shows the launch of the bridge from the approach span of Borough Viaduct, above Borough Market:

See also “Experience in the Rail Sector” on the V-Consult Limited website

Posted in Work
0 comments on “Borough Viaduct Open
1 Pings/Trackbacks for "Borough Viaduct Open"

Leave a Reply